Generation nuclear
Contents |
[edit] Introduction
ICE’s insights paper examines the benefits and challenges of delivering new nuclear power in the UK. This short blog explores some of the key themes covered in the paper.
[edit] A nuclear future?
Hinkley Point C is the first UK new build nuclear reactor for several decades. This third-generation plant could provide the blueprint for others to follow, but can this low-carbon solution deliver at scale in a cost-effective way?
Rising demand, the electrification of our transport and heat networks and increasing digitisation could mean that keeping the lights on becomes more challenging than ever before.
This comes as the nation is taking steps to alter how we generate electricity for a net-zero emissions future. In the coming decades, the UK’s energy mix will move away from dependable, yet polluting, oil, coal and gas. In fact, the country is going months at a time without burning any coal at all.
Renewables have somewhat stepped into the breach and now provide around 40% of electricity generation. However, generating power using renewable technologies is not without its challenges, and the UK is perhaps neglecting the potential nuclear presents as an alternative low-carbon source of electricity.
[edit] Nuclear as part of a diverse energy mix
Nuclear, like traditional power plants, provides power by heating water into steam which drives turbines. This source of power is reliable and carbon free, meaning it can contribute to the de-carbonisation of electricity generation without the downside intermittency of solar and wind technologies that are currently susceptible to the changing weather.
There have, however, always been cost concerns with nuclear and many projects have gone over budget around the world. Only a handful of third generation plants have been completed.
While there is hope that a programme of repeatable plant designs and reforms to financing could bring costs down, the advice from the National Infrastructure Commission has been to only agree to one more nuclear project before 2025.
[edit] Building new capacity
This advice stands in contrast to past government ambitions when plans were drawn up to build up to eight new nuclear plants before 2025. Only one, Hinkley Point C, is likely to be completed by this time.
The Government has recently consulted on adopting a form of the Regulated Asset Base model for the nuclear sector, which will change how the sector is financed. This is a potentially important step given that up to two thirds of the cost of a new power plant can be taken up in financing the project.
In the longer term, small modular reactors which could be built more easily, using manufacturing and off-site construction techniques, could supplement major nuclear sites, promising lower cost, more flexible and more rapidly deployable power generation.
[edit] New horizons
Some polls suggest only a third of UK adults have a favourable view of nuclear, and many younger people neither understand the technology or the benefits it can provide. Yet it is necessary for the UK to have a diverse energy mix.
While renewables are promising, they are not always on. It will be some time before the grid can adapt to build up storage capacity or run using mainly intermittent supply. Hence, if the nuclear sector can improve its cost effectiveness, it will be an integral part of meeting our future power needs and reaching net-zero.
The full paper is available to download from this link: Civil engineering insights into nuclear new build in the UK.
This article originally appeared on 9 July 2020 under the title, 'Generation nuclear? Civil engineering insights into nuclear new build in the UK', on ICE's Infrastructure Blog. It was written by Ben Goodwin, Lead Policy Manager.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings
Featured articles and news
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.